Ah, fabric was purchased this week, but it’s okay. It’s for the Droid Quilt Along taking place over at The Stitch TV Show. Cutting directions start tomorrow, and the quilt will be finished in time for Christmas.
This stack for the quilt (plus some aqua and extra white I needed) is from the Fabric Shack. They are open late on Thursday evenings, so DH and I motored down there, and also ate at the Stone House Tavern, on the deck, with live music. Yes, I’m that devoted to quilting.
I have made good progress on the Turquoise and Gold quilt, but I still have to bind it. The only finish this week is eighteen foundation pieced string blocks for Kat’s October block drive. I was going to make twelve, but I still had strings left out from my pull, so I made six more. Very difficult to go completely scrappy, but I did it.
This week: + 17 yards, – 3.75 yards
This year: + 110.25 yards, – 134.75 yards
Net fabric destashed in 2015: 24.50 yards
No worries. I’ll make my goal and then some. Hope you’re making good progress toward your goal.
I’m linking up to Judy’s report at Patchwork Times.