The Stash this week: Nothing in and nothing out. I felt like I had a finish when I completed the gray and yellow top (140 3″ squares), but I won’t count it until I quilt it. Good news: I found the perfect backing for it on sale at Fabric Shack. Bad news: It wasn’t the only thing I ordered. This new biweekly fabric ordering needs to stop, but I needed some navy for a commission…Yeah.
This week: +0 yards, -0 yards
YTD: +44.25 yards, -65 yards
Net stash used 2014: -20.75 yards
March Goals
1. Assemble Disappearing Pinwheels top.
2. Quilt DP quilt. Finished, and mailed off for Oso, WA.
3. Make baby quilt for Etsy shop. Hey, I got on a roll and made three! Chevron Strings, and the Construction Quilts.
4. Make floral quilt for Etsy shop. Nope. But I’ll be finished with four pillow covers before the month is over, so that’s something.
April Goals
1. Quilt gray and yellow quilt.
2. Make commissioned baby quilt in navy.
3. Make a floral quilt.
4. Design a block for my Slow Quilt. I’m collecting the fabrics.
Also, I found this book at Half Price Books this week. When I said, “curves”, I was thinking of something simple like Drunkard’s Path (and that’s in here, but fancy). This is very advanced. Right now, I think I’m most interested in the bias curves, but the paper pieced stuff is interesting to consider.
How did you do in March?
I’m linking up to Sunday Stash Report at Patchwork Times.
March 30, 2014 at 11:48 AM
The folks at the Fabric Shack are great to work with. You did good meeting your goals.
March 30, 2014 at 4:59 PM
Good job! You are really making progress. I took a class from Barbara Barber once. My class sampler is still half done. 😉