It’s March already, or finally, however you’re feeling. If you’re about to get snowed in one more time, you may not believe me, but it’s true. March is the month when we revisit our goals and try to get back some of that January enthusiasm. Darla, The Scientific Quilter, asks us to commit to 15 minutes a day as we March-A-Long. Read her post and watch her video for lots of ideas to get you into your studio every day.
February Goals
1. Quilt the log cabin Quilt of Honor quilt. (Did this during the QOV and Sports Bowl Sew-Ins.)
2. Piece and quilt triangle commission quilt.
3. Piece and quilt string commission quilt.
4. Assemble Scrapitude top. (And quilted it!)
I’m happy to say I busted through all my February goals. I’ll post finished Scrapitude pictures soon. I’ve mailed off the Quilt of Valor, and my cousin’s very happy with her pair of commissioned quilts.
March Goals
1. Assemble Disappearing Pinwheels top.
2. Quilt DP quilt.
3. Make baby quilt for Etsy shop.
4. Make floral quilt for Etsy shop.
Good luck on your goals, and I’ll be Marching with you over here.
March 2, 2014 at 2:48 AM
Yay, well done!